4D Sequencing & Logistics
Our project management workflow integrates scheduling timelines directly with the 3D model database (a process called 4D BIM). By matching Gantt chart tasks with specific model elements, we simulate the entire assembly sequence virtually. This allows planners to locate staging conflicts, optimize material storage coordinates, and preview the site's critical path before breaking ground.
During field operations, we run photogrammetric drone scans weekly. The resulting 3D meshes are overlaid onto the master model to automatically highlight execution deviations, track actual progress ratios, and verify milestones against the schedule.
Consolidating Microsoft Project and Primavera P6 schedules and linking WBS activity keys directly with structural elements in the model database.
Simulating temporary safety structures, crane sweep spheres, and material staging laydowns to identify physical space constraints.
Conducting weekly drone photogrammetry flights to capture 3D point cloud coordinates matching exact current site geometry conditions.
Overlaying point clouds onto 4D sequences to calculate precise volume completion metrics and automatically flag delays to stakeholders.
Our scheduling workflows sync master models directly with professional planning databases: